Skip to content
Request a callbackCallback
A row of painted Victorian terraced houses with sash windows and iron railings on a London street

Structural Surveys and Engineer's Reports

For homeowners, buyers, landlords and developers: we find what is causing the cracks or movement and show you the fix.

Combined team experience

834 design projects delivered
by our team

What stands behind your project

  • 561major construction projects delivered (combined team experience)
  • 10 yearson the market, trading since 2016
  • £10Mprofessional indemnity cover on our design work
  • 8 weeksto design and build the Banbury warehouse, with the site kept running

Find the cause first, then fix it once

Our structural engineers carry out structural surveys and write engineer's reports for homes, blocks and commercial buildings in London and across the UK: cracks, movement, subsidence, sagging floors and roofs, and checks before you buy, convert or extend. If repairs are needed, the same team designs them and can carry them out.

We inspect single homes, blocks of flats, shops, offices and industrial buildings; the report answers one question or covers the whole structure, as you need.

Who it is for: homeowners, buyers, landlords and developers. What you get: a visit, the cause in plain words, a written report and a repair design. Where: London first, then the rest of the UK.

The back wall of a house opened up for new work, with a steel prop holding the structure above

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

When do you need a structural survey?

Six moments when an engineer should look before anyone fills, buys or builds. Pick yours, or send us photos and we tell you.

A brick garden wall split from top to bottom by a wide vertical crack

Cracks in walls

A crack that is new, wide or growing, inside or out.

Old brickwork with a crack stepping through the mortar and splitting the bricks

Subsidence or movement

Doors that stick, floors that slope, cracks that open and close.

A lath and plaster ceiling that has given way, with broken timber laths hanging down

Sagging floors and roofs

Floors that bounce, ceilings that drop, roofs that dip.

A brick mews house in London with a black garage door, front door and iron stair

Before you buy

Know what you are buying when your surveyor flags a problem.

A two-storey rear extension under construction on a semi-detached house, wrapped in scaffold

Before you convert or extend

Check the walls and floors can take the new work.

A bedroom ceiling with the plaster down, showing the timber laths above the window

After damage

A leak, an impact or a fire: what is still safe and what is not.

What does a structural survey include?

An engineer's mark-up of an existing floor plan, showing the slabs and steel beams found on site

Our engineer visits, looks at the cracks, walls, floors and roof, and measures what has moved. You get a short summary in plain words first: what is wrong, why, how urgent it is and what fixes it.

Then the detail: findings with photos, the cause, the repair options and the next steps.

Read more

Where it helps, we check levels across floors, look at the drains and trees near the house, and record the width of each crack. If a crack may still be moving, we set up monitoring so we can see whether it opens further over time.

The survey covers what can be seen and reached on the day. If the cause is hidden, we say what needs opening up and why, before anything is broken out.

Structural survey or building survey: which do you need?

A stripped room inside the vacant Allitsen Road building, recorded by our team during the condition survey

A building survey from a surveyor looks at the whole home: roof, damp, windows, services and repairs. A structural survey from our engineer looks at one thing in depth: is the structure sound, what is causing the problem and how is it fixed.

If your surveyor's report flags cracks or movement, that is the moment to book an engineer. Our structural survey cost guide compares the two.

Read more

RICS describes three levels of home survey, carried out only by surveyors licensed to do so. It says level three suits a large, older or run-down property, a building that is unusual or altered, or one where you plan major works, and that it gives detailed information about the structure and fabric.

RICS also says that if you are buying a home, you should have a survey done before you enter into a contract. We do not carry out RICS home surveys: we answer the structural question that a home survey raises.

Subsidence surveys and crack monitoring

A steel prop holding up the floor above inside a house during structural repairs

A subsidence survey finds out whether the ground under your home has moved, and why. We look at the pattern of the cracks, the soil, nearby trees and the drains, and tell you whether the movement is old or still going on.

Our guide to subsidence cracks shows which cracks are worth a call.

Read more

The Financial Ombudsman Service says all properties suffer from cracking, but cracks do not automatically mean subsidence. It also says most home insurance policies cover subsidence, heave and landslip, so read your policy and tell your insurer early.

When a claim is made, the Ombudsman says the investigation may include shallow holes to check the foundations, boreholes for ground samples and a camera inspection of nearby drains. Sometimes the movement is monitored over a year so that all the seasons are covered. Our report sets out what we found, ready for your insurer, your buyer or your lender to read.

How it works

How does a structural survey work?

01

Photos and a call

You send photos and the address. Our engineer tells you what the visit will cover and the fixed fee.

02

Site inspection

The engineer walks the building, records each crack and checks how far things have moved.

03

Your report

Plain words first: the cause, what needs doing now and the repair. Photos and detail follow.

04

Repair design

If repairs are needed, the engineer designs them and writes the calculations for building control.

05

Repairs by our team

Our own site team can carry out the repairs, or your builder works from our design.

Cover of the free Craftex Guide to Residential Design and Build

The Craftex Guide to Residential Design and Build

Planning to repair, extend or convert once the survey is done? Our free guide walks through the design stages, the approvals, the budget and the programme, so you know what comes after the report.

Our promises

Six promises, written into your contract

These are terms in your contract, not sales lines. They hold for one crack and for a whole block.

  1. The engineer who inspects writes your report

    No hand-over to someone who never saw the building.

  2. A fixed fee, agreed first

    You know the survey fee before the visit. Nothing is added without your written yes.

  3. Plain words first

    The summary tells you what is wrong, why and what fixes it, before any technical detail.

  4. Repairs designed by the same team

    Our engineers turn the findings into a repair design and calculations.

    Slingsby Place: new structure behind kept façades, delivered by our team

  5. £10M insurance cover

    Public liability, employers' liability and professional indemnity: £10M each.

  6. Built by our own team if you want

    Around 60% of the labour on site is our own, so the repair follows the design.

    Banbury warehouse: one team from drawings to handover

A printed quotation for a structural survey with a note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a fee proposal for a structural survey, or a builder's price for the repairs? Send it to us. We look at the scope and come back with our figure for the same work.

What goes wrong without a survey

Where do structural problems get worse?

Most of the cost of a structural problem comes from treating it late or treating the wrong thing. Compare the two routes.

AreaWithout an engineerWith Craftex
The crackThe crack is filled and painted, then it opens againWe find what moved first, then fix the cause
The causeA drain, a tree or the foundations get blamed by guessworkWe check each possible cause and say which one it is
The insurerThe insurer hears about the movement months laterYou get a written record of what we found, ready to send
The saleA buyer's survey flags movement and the sale stallsA clear report answers the buyer's questions
The repairA builder starts the repair with no calculationsOur engineer designs the repair before anyone starts
The paperworkNothing on paper when you come to sellA dated report and a repair record you keep

From the report to the repair, one team

A long section through an existing occupied block, drawn by our team before new work was designed

Once the cause is known, our engineers design the repair: new lintels, ties, beams, underpinning or a rebuilt section of wall. They write the calculations for building control and check the work on site.

See our structural engineers page for the full design service.

Read more

Our site team can carry out the repairs under one contract, from a single wall to a basement. Leaving a lease and need a schedule of the landlord's claims instead? Our dilapidations surveyor page covers that.

What is in your report?

Every report follows the same order, so you can find the answer you need in a minute.

PartWhat it tells you
SummaryWhat is wrong, in plain words, on the first page
FindingsWhat the engineer saw and measured, with photos
CauseWhy it happened, and whether it is still moving
UrgencyWhat needs doing now and what can wait
RepairsThe repair options and which one we recommend
Next stepsWho to call: insurer, building control, your buyer or builder

The fee is fixed before anyone visits.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Structural surveys: your questions

How much does a structural survey cost?

We fix the fee after you send photos and we talk, so you know it before the visit. Our cost guide lists the market ranges other sources publish.

How soon will I get the report?

We agree the date when you book, so you can plan around it. Urgent? We can visit the same day or the next day.

Are the cracks in my wall serious?

Not always. We look at the width, the shape, where each crack runs and whether it is still moving. Our guide to cracks and subsidence explains the signs.

Do I need this or a homebuyer survey?

A homebuyer survey covers the whole home in less depth. Our survey answers the structural question it raises: what moved, why, and how to fix it.

Will my insurer or lender accept your report?

We write it so an insurer, a lender or a buyer can read it. The decision is theirs, and we answer their questions about what we found.

Can you also design and carry out the repairs?

Yes. Our engineers design the repair and our own site team can build it under one contract.

Do you inspect commercial buildings and blocks of flats?

Yes: shops, offices, warehouses, industrial units and blocks of flats, as well as houses.

Can you come outside London?

Yes. We work across the UK and agree the visit date on the first call.

What our clients say

See all reviews on Google
  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Worried about cracks or movement?

Send photos of the problem, the address and when you noticed it.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us