Skip to content
Request a callbackCallback
The fountain and formal garden in Priory Park, Reigate, below wooded hills

Commercial Builders in Reigate and Redhill

Shops, offices and industrial units in Reigate, Redhill and Merstham altered, refitted and refurbished by one team on a fixed price.

Our track record

100% of projects delivered ahead
of programme and on budget

Delivered by our team

  • 4 floorsfitted out turnkey for Medusa in Knightsbridge, from drawings to keys
  • 17 weeksfrom concept to handing Medusa the keys, planning for the signs and air conditioning included
  • 500 m²railway arch in Bethnal Green converted into a working warehouse for Drake's
  • 10/10the score Drake's gave our team at handover

Building work for Reigate and Redhill businesses

We are a commercial building contractor for owners and tenants in the borough of Reigate and Banstead. The work runs from a new shopfront in a town-centre street to stripping out and refitting an industrial unit on the edge of Redhill, and the same team designs it, prices it and builds it.

Most jobs here are changes to buildings that are already in use: a wall taken out to join two rooms, a floor turned into offices, a unit made ready for a new tenant. We plan around your opening hours and keep the rest of the building working.

Our team is based in London, a short run down the M23 or the Brighton Main Line, and one director handles your project from the first visit to the final certificate.

Timber staircase and panelled walls our team refurbished at Medusa, Beauchamp Place, Knightsbridge

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Commercial building work in Reigate and Redhill

From a single alteration to a whole-building refit. Related services: commercial fit-out and refurbishment, strip-out contractors and retail fit-out and shopfitting.

Shop window with a pendant light at Medusa, Beauchamp Place, Knightsbridge, fitted out by our team

Shop fitting and shopfronts

New fronts, counters, display joinery and lighting for shops, salons and cafés.

Open-plan desks under light rafts at Portsoken House, Aldgate

Office alterations

Walls moved, rooms added and floors refreshed for firms that are growing or downsizing.

An industrial unit in Hackney, emptied and ready for our fit-out

Industrial unit strip-outs

Old fittings, partitions and services removed safely, and the shell left clean for its next use.

Railway arch fitted out in white by our team for Drake's in Bethnal Green

Unit refits for new tenants

Offices, welfare rooms, lighting and power put into a stripped unit so it can be let or used.

External steel stair at Portsoken House, Aldgate

Openings, stairs and steelwork

Structural changes designed by engineers and signed off by building control.

Electrical installation under way in the Hackney unit our team fitted out

Electrical and heating upgrades

New boards, lighting, heating and ventilation, tested and certified at the end.

Black-clad industrial units around the yard of the Hackney unit our team fitted out

Reigate, Redhill and the A23 corridor

Reigate and Redhill sit side by side in the borough of Reigate and Banstead, about 19 miles south of central London and a few miles north of Gatwick Airport. Reigate is the older town, with its centre below the North Downs. Redhill grew up around its railway junction in the nineteenth century and is the commercial centre for Earlswood, Merstham and the villages nearby.

North of Redhill station, the Holmethorpe Industrial Estate is home to dozens of firms in industrial units, and the M25 and M23 meet within three miles of the town. Trade counters, workshops, storage and service firms sit alongside the offices and shops of the two centres.

Planning and building control for both towns sit with Reigate and Banstead Borough Council, whose offices are at the Town Hall on Castlefield Road. Redhill alone has three conservation areas, so we check a building's status before anything is drawn.

How it works

From first call to finished building

01

Call and visit

Tell us what you need; a director comes to see the building and takes measurements.

02

Design and costing

Drawings where they are needed and a fixed price broken down by trade.

03

Approvals

Building regulations, planning or a landlord's licence, applied for by us where the job needs them.

04

On site

Our own trades, working around your opening hours, with the site left safe and tidy each day.

05

Sign-off

Building control completion, test certificates and a walk round with you before we leave.

Rooms in shell condition inside the Banbury warehouse, Oxfordshire, before our fit-out

Stripping out and refitting an industrial unit

When a tenant leaves a unit, the next occupier usually wants a clean shell: old offices, racking, partitions, cabling and redundant pipework taken out, and the floor and walls made good. We check for asbestos first, isolate and cap the services, then strip in an order that keeps the structure safe and every load of waste recorded.

If you are taking the unit on, we carry straight on with the refit: offices and welfare rooms, a new electrical board, LED lighting, heating and a sealed or resin floor. One contractor for both stages means no gap between them and one programme to hold us to. More on strip-out works.

Cover of the free Craftex Guide to Commercial Fit Out

Free guide to commercial fit-out

What to check in the lease, how to compare builders' quotes, which approvals a refit needs and how long each part takes, all in plain English.

On every Reigate and Redhill job

What we put in writing

Six commitments that sit in the contract.

  1. Agreed price

    A fixed figure before we start; extra work only after you have seen and approved its cost.

  2. A real programme

    Dates for each stage, built around your trading hours or the day a tenant moves in.

    Medusa: four floors, keys back in 17 weeks

  3. One firm responsible

    Design, permissions and building work under a single contract.

  4. Directly employed trades

    The carpenters, electricians and decorators on site mostly work for Craftex.

  5. £10M of insurance

    Cover of £10M each for public liability, employers' liability and professional indemnity.

  6. A clean handover

    Certificates, drawings and manuals in one file, and the building cleaned before you take it back.

Example retail fit-out quotation from another contractor with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Holding a quote from another builder for work in Reigate or Redhill? Send it to us with any drawings. We check what it includes and what it leaves out, then send our own fixed price for the same job, together with a start date.

Compare your quotes

Choosing a commercial builder in Reigate: six checks

Ask every builder how they handle these.

AreaThe usual riskWith Craftex
AsbestosFound halfway through the strip-outChecked before the price is set
Opening hoursShop or office shut for longer than plannedNoisy work early, late or at weekends
Building controlSign-off chased after the builder has leftInspections booked as the work goes
Shopfronts and signsFitted without the consent they needPlanning and advertisement consent checked first
ExtrasA low price that grows on siteEvery change priced and approved in writing
PaperworkNo certificates when a tenant or buyer asksFull handover file on the last day

Commercial building costs in Reigate and Redhill, 2026

Typical ranges at our 2026 rates, before VAT and fees. The fixed price follows a visit.

Type of workWhat it usually coversOur 2026 range
Light refurbishmentDecoration, flooring, lighting and small layout changes£36–63 per sq ft
Full fit-outNew layout, ceilings, services and finishes£67.50–108 per sq ft
Specialist interiorsSalons, clinics and flagship shops with bespoke joinery£113–180 per sq ft
New shopfrontFrame, glazing and entrance door for one frontage£14,000–45,000 per frontage
Industrial unit refurbishmentStrip-out, repairs, lighting and a sealed floor£9–27 per sq ft

Asbestos removal, structural steel and out-of-hours work are priced after the survey. For shops: shop fit-out cost.

Want the numbers in detail before you commit? Our cost plan is from £750 + VAT, and we deduct that fee from the contract if the work goes ahead with us.

Free cost calculator

Estimate your Reigate or Redhill project

Enter the floor area and choose the level of work.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

A rough guide before VAT and fees, for space with sound services. Strip-outs and structural work are priced on site.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Commercial builders in Reigate: your questions

Which areas do you cover?

Reigate, Redhill, Merstham, Earlswood, Salfords, Horley and Banstead, and the rest of Surrey and Sussex nearby.

Can you strip out an industrial unit at the end of a lease?

Yes. We check for asbestos, disconnect and cap the services, remove fittings and partitions, and hand the unit back clean, with waste records. If a schedule of dilapidations applies, we price against it: see tenant dilapidations.

Can you work while we keep trading?

Yes. We phase the work, screen off each area and move the loud jobs outside opening hours. At Portsoken House the reception was rebuilt at nights and weekends with every tenant at work.

Do you deal with building control?

Yes. We submit the application, book the inspections as the work goes and give you the completion certificate at the end.

What size of project do you take on?

Most of our commercial projects run from about £100,000 to £10M and above, from a single shop to a whole building.

Do I need planning permission for a new shopfront?

Usually, because a new shopfront changes how the building looks, and illuminated signs often need advertisement consent as well. We check with the council and make the applications.

How fast can you start?

We reply within one hour, Monday to Saturday, 8am to 6pm. For urgent works we can visit the same day or the next day.

Do you also fit out offices in Guildford?

Yes: see office fit-out in Guildford, and for warehouses across the county, warehouse refurbishment in Surrey.

What our clients say

See all reviews on Google
  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

Urgent? Message us on WhatsApp: we reply straight away, any day.

Got a building job in Reigate or Redhill?

Send us the address, a few photos and what you want done. We will visit, explain what it involves and give you a fixed price.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us