Skip to content
Request a callbackCallback
Red and blond sandstone commercial buildings on a street in Glasgow city centre

Commercial Refurbishment in Glasgow

Victorian sandstone, Merchant City warehouses and post-war blocks brought back into use for tenants or owners.

Our track record

100% of projects delivered ahead
of programme and on budget

Office and industrial refurbishments, England

  • 2 floorsfitted out from bare at Portsoken House, Aldgate, in seven months
  • 70 m²of reception rebuilt out of hours there, tenants at their desks
  • 2 weeksfrom the first call to starting on site at Beaumont House, Kensington
  • 2,500 m²of warehouse at Banbury, Oxfordshire, refurbished while it traded

A building that works again, without starting from scratch

Commercial refurbishment in Glasgow, by our team, means taking an existing office building, shop or mixed-use block and making it lettable, efficient and compliant again: new services, new layouts, repaired fabric and finishes that tenants will pay for. Design, approvals and construction sit in one contract.

Craftex is based in London and works for clients across Britain; we do not keep a Glasgow office. A director comes to the building before we price it, and the people who survey it are the people who run the works, with most of the trades employed by us.

When the reception of Portsoken House in Aldgate had to be rebuilt with every tenant still at work, our team did it at night and at weekends over 12 weeks. Ask us how we would phase your building.

Glass-fronted offices on a refurbished floor at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London, refurbished by our team

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Refurbishment work we take on in Glasgow

One floor, a whole block or the parts every tenant shares. Nationally: commercial fit-out and refurbishment and commercial construction.

Fitted-out open-plan office floor at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Whole-floor refurbishment

Ceilings, lighting, heating and cooling, floor boxes and finishes renewed across an empty floor.

Entrance lobby with glass doors at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Entrances and lift lobbies

The first impression of a building rebuilt in stages, so the lifts and stairs stay in use.

Shop floor refitted by our team at Drake's, Savile Row, London
Pictured: Drake's, Savile Row, London

Shop units below offices

Ground-floor units stripped and refitted for the next retailer or café, with the frontage repaired.

New ceiling services on an office floor at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Plant and electrics

Boards, risers, heating and ventilation replaced, then tested and certified before anyone moves in.

Frosted-glass meeting room at Beaumont House, Kensington, London
Pictured: Beaumont House, Kensington, London

Meeting rooms and kitchens

Glazed rooms, tea points and breakout space added where tenants now expect them.

Workbenches and services by the new block in the Banbury warehouse, Oxfordshire
Pictured: Banbury, Oxfordshire

Industrial and trade units

Sheds and trade counters refurbished with offices, welfare, racking and better lighting.

Sandstone buildings and the Tolbooth Steeple on Trongate, Glasgow, at the edge of the Merchant City

Sandstone blocks, Merchant City warehouses and the newer towers

Glasgow's commercial core was built in sandstone. The grid of streets on Blythswood Hill and along St Vincent Street and West George Street is lined with Victorian and Edwardian office buildings in red and blond stone: deep plans, tall windows, cast-iron and timber floors, and lightwells that limit where risers and ducts can go. Many are listed, and some interiors are as protected as the façades.

East of George Square, the Merchant City was renamed and renewed in the 1980s; its former warehouses and civic buildings now hold offices, flats, shops, restaurants and bars, often in the same block. That mix means refurbishment has to protect residents and traders above and below. Down by the Clyde, offices from the last thirty years need new plant, lighting and controls more than new walls.

We look at the structure, the services and the occupiers of the building before we decide how a refurbishment should be staged.

Black steel external escape stair at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Warrants, listed interiors and fire safety after the works

Scottish building standards apply to almost every refurbishment that changes a layout, the services or the way people escape. Under the Building (Scotland) Act 2003 the work needs a building warrant from Glasgow City Council before it starts, and the council has to accept a completion certificate before newly converted space can be occupied. A conversion, for example offices above a shop becoming flats or a warehouse becoming offices, needs a warrant in its own right.

On a listed building the consent covers the inside too: cornices, panelled boardrooms, cast-iron columns and stairs may need listed building consent before they are altered, with Historic Environment Scotland consulted on some cases. Planning applies when the use changes or the outside does: a ground floor moving outside Class 1A, new plant on the roof, replacement windows in a conservation area.

Once the building is back in use, the Fire (Scotland) Act 2005 requires employers to carry out a fire safety assessment of the workplace and keep it under review, so we hand over the drawings, alarm and emergency lighting certificates the assessor will ask for.

How it works

Five stages of a Glasgow refurbishment

01

Walk the building

Fabric, services, asbestos register, lease covenants and tenants' access recorded on the first visit.

02

Priced schedule of works

Each package priced separately, so you can stage the spend floor by floor.

03

Warrant and consents

Warrant, listed building and planning drawings prepared, with the landlord's or owners' approvals.

04

Phased works

Strip-out, services and finishes done in phases, the occupied parts protected and kept running.

05

Certificates and handover

Completion certificate to the council, tests, manuals and drawings for the fire assessor.

Visitors at the reception desk our team rebuilt at Portsoken House, Aldgate, London
Pictured: Portsoken House reception, London

Staying open while we work

Refurbishment rarely gets an empty building. At Portsoken House in Aldgate our team took two floors from bare shell to finished offices over seven months while another floor was let and in use; the reception followed at night and at weekends so that no tenant lost the entrance for a working day.

At Banbury in Oxfordshire we refurbished a 2,500 m² warehouse in eight weeks with the site operating: offices and storage rooms inside the shell, changing rooms, racking, polished floors, an electrical upgrade with high-voltage works and new ventilation. A Glasgow block is planned the same way, with the building manager signing off each phase.

Cover of the free Craftex Guide to Commercial Fit Out

The Craftex Guide to Commercial Fit Out

How a refurbishment is scoped, priced and phased around occupiers, and the checklist that protects the date it must be ready.

In every Glasgow refurbishment contract

Six terms we sign

Written into the contract before work begins.

  1. Price after the survey, not before

    We see the building before we commit to a number.

  2. A fixed sum for the scope

    Nothing outside the agreed scope is built until you have signed its cost.

  3. A phasing plan for occupiers

    Hours, routes and noisy work agreed with the building manager.

    Portsoken: reception rebuilt at nights and weekends.

  4. Directly employed trades

    Most of the people on site work for Craftex, about 60% of the labour.

  5. Insured for owners and lenders

    £10M each of public, employers' and professional liability; ISO 9001, 14001 and 45001.

  6. Handover papers complete

    Completion certificate, test results, manuals and as-built drawings on the last day.

Example refurbishment quotation from another contractor with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a refurbishment tender back already? Send us the price and the specification. We look for exclusions, provisional sums and gaps in the phasing, and return a lower figure for the same work with our own programme.

Compare your quotes

What derails a Glasgow refurbishment, and what we do instead

Six things to ask any refurbishment contractor.

AreaThe usual riskWith Craftex
Old buildingsRot, asbestos or failed steel found after the contract is signedOpening-up survey and asbestos check before the price
Listed interiorsA cornice or boardroom panelling lost without consentHistoric fabric recorded, consent obtained first
Tenants in placeLifts out of action and complaints from every floorOne lift kept free, noisy work outside office hours
WarrantSpace finished but not accepted for occupationCompletion certificate submitted with the tests
Ground floor usesA café or takeaway let without checking planningUse class checked before the unit is marketed
After handoverNo paperwork for the fire risk assessmentDrawings and certificates handed over for the assessor

What commercial refurbishment costs in Glasgow, 2026

Our 2026 rates per square metre before VAT and fees. Glasgow projects use our national rates, with no London uplift.

ScopeWhat is includedPer m² (per sq ft)
Strip-outCeilings, partitions, raised floors and old cabling cleared to shellfrom £94 (£8.75)
Light refurbishmentRedecoration, LED lighting, carpets, small electrical works£532 (£49.50)
Major refurbishmentNew heating, ventilation, electrics, ceilings and WCs£1,190 (£111)
Major refurbishment with air conditioningAs above, cooling added throughout£1,345 (£125)

Stone repairs, window replacement, asbestos removal and listed interiors are priced once surveyed. Background: a value-add refurbishment strategy.

The survey gives a fixed sum and programme; a detailed cost plan is from £750 + VAT, credited if we build.

Free cost calculator

Price range for your Glasgow building

Enter the gross floor area and pick a scope to see a 2026 range at once.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed price

Indicative, construction only, before VAT and fees. Stone, glazing and asbestos are priced after the survey.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Commercial refurbishment in Glasgow: common questions

Do you have a team based in Glasgow?

No. We are a London firm working across the UK. A director surveys the building, prices it and remains your contact through the works.

Our building is listed. Can we still modernise it?

Usually. New services and layouts can often be threaded through with listed building consent, keeping cornices, stairs and panelled rooms. We record the fabric first.

Do we need an energy action plan to let the building?

If a non-domestic building or unit is over 1,000 m², a section 63 action plan must be available to prospective tenants or buyers. We can price its improvement measures into the refurbishment.

How long will it take?

It depends on the scale. Beaumont House, 750 m², took three weeks on site; two floors with all-new services at Portsoken House took seven months.

Will the refurbishment need a building warrant?

If it changes layouts, services, fire protection or escape, yes. Redecoration and like-for-like repairs usually do not. We check the scope against the regulations and prepare the application.

Can the shop on the ground floor become a café?

It depends on what it serves. Shops and most services share Class 1A; a café selling hot food to take away, or a restaurant, normally needs planning permission. We check before you market the unit.

Can tenants stay while you work?

Yes, in most buildings. We phase floors, keep a lift and stair free and do the noisiest work outside office hours, as we did at Portsoken House.

What do you need from us to start?

The address, floor plans if you have them, the lease or title constraints and the date the space must be ready. We visit and return with scope, price and programme.

What our clients say

See all reviews on Google
  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.

Refurbishing a building in Glasgow?

Tell us the address, how much space there is and when it has to be ready. A director replies with the warrant position and a first programme.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us