Skip to content
Request a callbackCallback
Portsoken House in Aldgate, City of London: the stone corner office building with a red London bus passing

Office Fit Out in the City of London

Cat A and Cat B floors fitted out around your lease, your landlord and your team.

Our track record

100% of projects delivered ahead
of programme and on budget

Portsoken House, Aldgate

  • 1,550 m²of offices across two floors, fitted out from bare shell
  • 7 monthson site, with every other tenant in the building at work
  • £2.2Mcontract value for the two floors and their services
  • 70 m²main reception rebuilt by our team at night and at weekends

Fit-out for City floors, from shell to the first working day

We fit out and refurbish offices in the City of London, from a single Cat B floor to a whole building, with one team from design to handover. At Portsoken House in Aldgate we fitted out 1,550 m² over two floors in seven months while the building stayed occupied.

City buildings are run tightly. A managing agent or landlord's surveyor will ask for drawings, method statements, insurance and a programme before the first trade arrives, and the building's fit-out rules decide when lifts, loading bays and noisy tools can be used. We plan the job around those rules from the start.

If your lease start or break date is already set, reach out and see for yourself how quickly we respond.

Open-plan desks under suspended light rafts at Portsoken House, fitted out by our team

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Cat A, Cat B and everything between

Our designers, estimators and trades work as one team. Smaller changes to a floor you already occupy: urgent office alterations. Floors prepared for letting: commercial fit-out and refurbishment.

Open office floor ready for fit-out at Portsoken House

Cat A: a floor ready to let

Raised floors, suspended ceilings, lighting, cooling and toilets brought to a lettable standard. Our wider service: office fit-out in London.

Glass-walled offices full of daylight at Portsoken House

Cat B: a floor ready to work

Your layout built in: meeting rooms, desks, kitchen, comms room, branding and furniture.

Visitors at the reception desk at Portsoken House after our refurbishment

Receptions and lift lobbies

The first room visitors and tenants see, often rebuilt out of hours.

Office floor with exposed services and ceiling grid during our works at Portsoken House

Services in the ceiling and floor

Ductwork, cable trays, lighting and fire alarm reworked to the new layout and tested.

Bike store fitted out by our team at Portsoken House

Cycle stores, lockers and showers

End-of-trip facilities that City staff now expect from a building.

Boardroom meeting table at Portsoken House, fitted out by our team

Boardrooms and client floors

Rooms for client meetings with acoustic walls, lighting and AV that work first time.

Looking up at the Leadenhall Building and Lloyd's building on Leadenhall Street, City of London

Fitting out in the Square Mile: landlords, rules and access

The City of London is governed by the City of London Corporation, not a London borough, and it sets its own requirements for building sites, including the hours when noisy work may run. We confirm those, and the building's own fit-out rules, before the programme is fixed.

Most City floors come with a landlord's fit-out guide: the standards for raised floors, ceilings, sprinklers and the base-build services that tenants must not compromise. We read it at the first visit, design within it and submit the drawings for the landlord's surveyor to approve alongside the licence for alterations.

Access is the other constraint. Deliveries are booked into a loading bay slot, goods lifts are shared with other tenants, and the street outside may be a red route. Our programme lists every delivery and lift booking, so nothing waits on the pavement.

How it works

How a City office fit-out runs

01

Brief and building pack

We take your headcount and dates, then read the lease, the fit-out guide and the base-build drawings.

02

Test fit and cost plan

A layout tested on your floor, priced line by line before you commit.

03

Landlord approval

Drawings, method statements, insurances and the programme submitted to the landlord's surveyor.

04

Build to the building's rules

Loading-bay slots, lift bookings and permitted noisy hours built into every week.

05

Commission and hand over

Systems balanced and tested, certificates and the operation and maintenance manuals delivered.

External steel stair at Portsoken House, Aldgate

Portsoken House: two floors in an occupied building

Portsoken House in Aldgate needed two office floors taken from bare shell to finished workplace while the rest of the building stayed in use. Our team planned noisy work around the other tenants, kept the common parts clean and phased deliveries through a single building entrance.

The 1,550 m² was finished in seven months. Separately, we rebuilt the building's 70 m² reception in 12 weeks, working only at night and at weekends so tenants walked through a normal entrance every morning.

Cover of the free Craftex Guide to Office Fit-Out

The Craftex Guide to Office Fit-Out

For facilities managers and finance directors: how Cat A and Cat B differ, what a landlord's fit-out guide asks for and how to protect the start date.

In every City fit-out contract

Terms we put in writing

These are clauses, not claims.

  1. Programme from your lease

    Lease start, rent-free period or break date sets the finish; we work back from it.

    Portsoken House: 1,550 m² in seven months.

  2. Cost certainty

    A fixed sum for the agreed scope; variations priced and approved in writing.

    100% of projects on budget.

  3. Neighbouring tenants respected

    Noisy work zoned and timed; common parts kept clean.

    Portsoken reception: rebuilt out of hours.

  4. Most trades in-house

    Around 60% of the labour is directly employed by us.

  5. Insurance landlords accept

    £10M public liability, employers' liability and professional indemnity; ISO 9001, 14001 and 45001.

  6. Handover pack

    Test certificates, O&M manuals and as-built drawings for your landlord and insurer.

Example office fit-out quotation from another contractor with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Tendering a City floor? Send us the quote you already hold. We check it against the fit-out guide and your programme, then come back with a lower figure for the same specification and our own dated plan.

Compare your quotes

Where City fit-outs lose time, and how we keep it

Six checks for any contractor's proposal.

AreaThe usual riskWith Craftex
Landlord's surveyorDrawings rejected for breaching the fit-out guideDesigned within the guide and submitted early
Base buildSprinklers, risers or ceiling grid damaged and charged backBase-build services surveyed and protected before work starts
DeliveriesLorries turned away with no loading-bay slotEvery delivery booked into a slot in the programme
Other tenantsComplaints about noise and dust in shared areasNoisy work zoned and timed; common parts cleaned daily
Design and build splitDesigner and contractor blaming each other for gapsOne team responsible for both
Day oneSystems not commissioned, manuals missingCommissioned, certified and documented before you move in

Office fit-out cost in the City of London, 2026

Per sq ft at our 2026 rates for a City office floor, before VAT and fees. Large open floors usually come in lower per sq ft than small ones.

ItemWhat it coversLow to high spec
Construction (Cat B)Partitions, ceilings, floor finishes, tea points and alterations to the base-build services£63–108/sq ft (£678–1,165/m²)
FurnitureWorkstations, task chairs, collaboration and boardroom furniture£18–54/sq ft
AV and ITMeeting-room technology, comms room and cabling£4.50–13.50/sq ft
TotalCat B with furniture and technology£85.50–176/sq ft (£920–1,890/m²)

Out-of-hours working, landlord requirements and Cat A works are priced per floor. For the difference between the two, read Cat A, Cat A+ and Cat B.

A fixed figure follows a survey of the floor; a detailed cost plan is available from £750 + VAT, credited against the contract if we build it.

Free cost calculator

What will your City office fit-out cost?

Put in the net area or the headcount and the finish level; the range uses our 2026 rates.

I know my
Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

For budgeting only, excluding VAT and fees. Night work and landlord conditions are added once we have the building's fit-out guide.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Office fit-out in the City of London: your questions

What is the difference between Cat A and Cat B?

Cat A is the landlord's standard: raised floor, ceiling, lighting, cooling and toilets, with no layout. Cat B is your fit-out on top: rooms, kitchen, furniture, technology and finishes. More in our guide to the three categories.

What hours can noisy work run in the City?

The City of London Corporation sets permitted hours for noisy construction work, and buildings often add their own rules. We confirm both before the programme is fixed and plan quiet work, such as decorating and furniture, for evenings where needed.

Do you work to the landlord's fit-out guide?

Always. We design within it, submit drawings and method statements to the landlord's surveyor and keep the base-build services protected.

Do you refurbish receptions?

Yes: the Portsoken House reception was designed and rebuilt by our team in 12 weeks, all of it out of hours.

Can you fit out while the building is occupied?

Yes. At Portsoken House we fitted out two floors while the rest of the building was in use, and rebuilt its reception at night and at weekends.

How long does a City office fit-out take?

Portsoken House, two floors totalling 1,550 m² in a building that stayed occupied, took our team seven months. A single floor is usually weeks, not months: for a 750 m² office our team took three weeks on site.

What does it cost?

Cat B construction is about £63–108 per sq ft ex VAT, before furniture and technology. The calculator above gives a range; a survey gives a fixed figure.

How do we start?

Tell us where the building is, how big the floor is and when the lease begins. We visit, read the fit-out guide and return with a test fit, a price and a programme.

What our clients say

See all reviews on Google
  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.

Fitting out an office in the City?

Send the address, the floor area and your lease dates. We will read the building's rules and tell you what can be done by then.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us