Office Refurbishment and Fit Out in Basingstoke
Floors on Basing View, at Chineham and near the station refurbished for the companies that work in them and the landlords who let them.
Our track record
100% of projects delivered aheadof programme and on budget
What our team has delivered
- 3 weeksfor the Beaumont House office refurbishment in Kensington
- 1,550 m²of offices refitted at Portsoken House, Aldgate, while other tenants stayed in the building
- 2 weeksearly on an office re-planned to take more desks (client review)
- £10Mpublic, employers' and professional liability insurance, each
A Basingstoke office refit that keeps to your moving date
Craftex carries out office refurbishment in Basingstoke and across north Hampshire. Our team surveys the floor, draws the new layout, agrees the licence with your landlord, fixes the price and does the work, so you sign one contract and one director answers for the result.
Much of the town's office space was built between the 1970s and the 2000s: the blocks of Basing View beside the station, the low-rise buildings at Chineham Business Park and the floors around Festival Place. Many still have their original ceilings, lighting and air conditioning, and an energy rating that makes them hard to let. Those are the floors a refurbishment puts right.
Basingstoke is about an hour from our London office by the M3, and the quickest Waterloo trains do it in under an hour. Our own employed trades carry out most of each refit, which keeps the programme under our control rather than a subcontractor's.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What an office refurbishment in Basingstoke covers
Each part below is designed, priced and built by us. Before you sign a lease, see office space planning; for a new or bigger fit-out, our office fit out service.
Whole floors refurbished
Ceilings, lighting, floor finishes and decoration renewed across the floor, with the layout reworked for today's team.
Meeting rooms and boardrooms
Glazed rooms with sound-rated partitions, screens and booking panels, sized to how often you meet.
Kitchens and breakout space
A tea point or a full staff kitchen with seating, so people have somewhere to eat away from their desks.
Receptions and lobbies
Entrance, reception desk and lift lobby rebuilt to give visitors and tenants the right first impression.
Cooling, lighting and power
Air conditioning, LED lighting, small power and data reworked to suit the new layout, then tested and certified.
Showers, lockers and bike stores
End-of-trip facilities for staff who cycle or run in from the town and the business parks.
Basing View, Chineham and the town centre
Basing View, next to the railway station, is Basingstoke's main office district: large blocks from the 1960s onwards, several of them now being renewed. Floors there tend to be deep and open, which suits a modern layout once the ceilings, lighting and cooling are replaced.
Chineham Business Park, on the north-east edge of the town, offers two and three-storey buildings with their own parking, where a tenant often takes a whole building and wants it refitted in one go. In the town centre, offices sit around Festival Place and the older streets, usually on smaller floors and shorter leases.
We also work across Hampshire and the borders: Winchester, Andover, Fleet, Farnborough, Hook and Newbury. Office projects we take on start at about £100,000 and go to £10M and above.
Refurbishing to let: Cat A, the energy rating and the landlord's licence
Landlords on Basing View and at Chineham usually refurbish for one reason: to get an empty floor let quickly. The job is to remove what the last occupier left, return the space to a clean Cat A fit-out with new ceilings, LED lighting and air conditioning, and improve the EPC. Since April 2023 commercial space in England with an EPC below E may not continue to be let, and the government has proposed raising that bar.
Tenants face a different gate. Inside an office, planning permission is seldom needed, but the lease requires the landlord's written licence before alterations, and Building Regulations apply to escape routes, fire separation and new wiring. Our team draws the licence pack and makes the building control application while the layout is being agreed, so the start date does not wait for paperwork.
Refurbishing while your staff keep working
Many Basingstoke companies cannot close for a refit. We split the floor into zones, move teams round in stages and keep exits, kitchens and toilets open throughout. Noisy and dusty work is booked for evenings and weekends, agreed with the managing agent in advance.
This is how our team refitted two floors at Portsoken House in Aldgate with other tenants working in the building, and rebuilt its reception at nights and weekends.
How it works
How your Basingstoke refurbishment runs
01
First call and visit
Tell us the deadline and team size; a director then visits to measure up and inspect cooling, electrics and fire alarm.
02
One drawing, one price
The proposed layout arrives with its fixed cost, so there is a single decision to make.
03
Approvals in parallel
Licence pack for the landlord, building control submission and alarm changes prepared while you review.
04
Works
Electricians, joiners, decorators and engineers on site together to a timetable built from your date.
05
Ready for Monday
Commissioned, certified and cleaned, with operating manuals for the facilities team.
The Craftex Guide to Office Fit-Out
Written for the person organising the move: which lease points to settle first, the costs that are often missed, and how to protect the moving date. Free to download and based on our own office jobs.
Written into every Basingstoke contract
Six things you can hold us to
Written terms, signed before work starts.
-
Moving date first
The programme is built backwards from the morning your staff arrive.
Beaumont House, Kensington: three weeks
-
A price that stays put
Extra work only proceeds once its cost is in writing and you have agreed it.
-
Single point of contact
One director, one contract, from drawings to handover.
-
Employed tradespeople
About six in ten people on our sites work directly for Craftex.
-
Insurance cover
£10M public liability, £10M employers' liability and £10M professional indemnity.
-
Handover documents
Test certificates and Building Regulations completion ready for your landlord.
Already have a quote? Send it to us. We'll beat it.
Already have a price for your Basingstoke office from another contractor? Send it over with the plan. We compare it with the floor and your date, then send our own figure for the same work, with a programme.
Compare your quotes
What delays an office refurbishment in Basingstoke, and our answer
Six questions to ask every contractor on your list.
| Area | The usual risk | With Craftex |
|---|---|---|
| Landlord's licence | Requested late, start delayed | Drawn up while the layout is agreed |
| Business park rules | Deliveries refused at the barrier | Slots and working hours agreed with the agent |
| Mobilisation | A month of pricing before anyone arrives | About two weeks from first call when needed |
| Trades | Queued one after another | Overlapping under one site manager |
| Who answers | Separate designer and builder | One contract covers design and works |
| Moving day | Open snags, missing certificates | Commissioned and signed off |
Office refurbishment cost in Basingstoke, 2026
Our 2026 rates, excluding VAT and professional fees. Most Basingstoke floors are measured in square feet; metric figures follow.
| Part of the budget | What it pays for | 2026 range |
|---|---|---|
| Refurbishment works | Walls, ceilings, floors, kitchen and changes to the services | £678–1,165 per m² (£63–108 per sq ft) |
| Furniture, AV and IT | Desks, chairs, storage, screens and cabling | £22.50–67.50 per sq ft |
| Whole budget | Works plus furniture and AV | £920–1,890 per m² |
| Example: 600 m² floor | Standard specification, works only | about £523,000 |
Bringing a shell floor to Cat A first, night work and business-park conditions add cost. Detail: office refurbishment cost.
A detailed cost plan starts at £750 + VAT and is credited when you build with us.
Free cost calculator
Work out a budget for your Basingstoke office
Key in the floor area or the number of staff, choose a finish and the range appears, at our 2026 rates.
Office projects by our team
-
Kensington, London Beaumont House: Kensington offices refurbished in three weeks on site. View case study
-
Aldgate, London Portsoken House: two office floors fully fitted out while the City building stayed occupied. View case study
-
Aldgate, London Portsoken House reception: a new entrance completed out of hours. View case study
The same directors lead every project
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Office refurbishment in Basingstoke: your questions
Which areas around Basingstoke do you cover?
Basing View, Chineham, the town centre and the rest of Basingstoke and Deane, plus Winchester, Andover, Fleet, Farnborough, Hook and Newbury.
Do we need planning permission to refurbish an office?
Seldom, for work inside. What you will need is the landlord's licence for alterations and building control approval covering fire, escape routes and electrical work, and we prepare both.
Do you work for landlords on Basing View and the business parks?
Yes: strip-out when a tenant leaves, a return to Cat A, a better EPC, and refreshed receptions and shared areas.
Can you clear our office at the end of the lease?
Yes, from a light de-fit to a full strip-out, including the dilapidations works your landlord asks for. See strip-out contractors.
How soon can you start?
We answer within one hour, Monday to Saturday, 8am to 6pm, and a site survey normally follows the same week. Where the date is tight, we can be working on site roughly two weeks from your first call.
Can you refurbish while our staff are in?
Usually, yes: we work in zones, keep exits, kitchens and toilets open and move the noisiest jobs to evenings and weekends.
What does an office refurbishment cost?
Refurbishment works at our 2026 rates cost £63 to £108 per sq ft before VAT, with furniture and AV budgeted separately. Use the calculator above for your floor.
Do you also refurbish warehouses in Basingstoke?
Yes, including offices and welfare inside the warehouse: see warehouse refurbishment in Basingstoke.
Useful reading for Basingstoke offices
Approvals: Building Regulations for an office fit-out. Scope options: the different types of office fit-out. Also in the region: builders in Winchester and office fit-out in Surrey.
What our clients say
See all reviews on Google-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.
Urgent? Message us on WhatsApp: we reply straight away, any day.
Refurbishing an office in Basingstoke?
Tell us the address, the size of the floor and your target date. A director answers with the next step and a first programme.



























