Skip to content
Request a callbackCallback
View from an upper deck over a bright warehouse with pallet racking, storage bins and marked aisles

Mezzanine Floors for Warehouses and Industrial Units

More floor space inside the building you already have: designed, approved and installed while you keep working.

Our track record

100% of projects delivered ahead
of programme and on budget

Warehouse projects our team has delivered

  • 2,500 m²Banbury: offices, storage rooms and racking built inside a working warehouse
  • 6 mceilings at the Fuse Energy unit in Hackney, where the client came back for mezzanine floor works
  • 4 weeksfor phase one in Hackney, about a week early
  • £10Mpublic, employers’ and professional liability cover

Extra floor space without a new lease or a move

Craftex designs and installs mezzanine floors for warehouses, distribution units, workshops and industrial buildings in London and across the UK. A steel deck can add storage, a packing area or offices above the floor you already rent, often for a fraction of the cost of moving.

One team checks the slab, designs the steel, gets building control approval, adds fire protection where it is needed and installs the deck with its stairs, guarding and pallet gates. If you want offices on top, the same team builds them, with lighting, heating and power, under the same contract.

Installation is planned around your shifts, so picking and dispatch carry on. Send us a floor plan and the height of the building and a director will tell you what the space can take.

Storage aisle with racking on a white resin floor in the Banbury warehouse

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Everything a mezzanine needs, under one contract

From the slab survey to the completion certificate. Part of a bigger project? See warehouse fit-out and refurbishment.

Multi-level steel storage structure with yellow beams and a walkway in a large warehouse

Storage decks

Steel decks sized for pallets, cartons or parts, with loading points and pallet gates.

Open-plan office with desks, plants and a timber stair rising to an upper level in a converted industrial building

Offices on the deck

Partitions, ceilings, glazing and a kitchen, finished above the warehouse floor.

Steel stair with mesh guarding and handrails rising to an upper floor

Stairs, guarding and gates

Steel stairs, 1,100 mm handrails and edge protection built to Approved Document K.

Steel stair with black railings rising through several floors of a commercial building

Fire protection

Fire-rated ceilings, cased columns, alarms and escape routes agreed with building control.

Power drops and wall heaters installed by our team in the Fuse Energy unit, Hackney
Pictured: Hackney, London

Lighting, power and heat

Lights under and over the deck, power drops, heaters and data, tested and certified.

Steel safety barriers and pallet racking beside the new block in the Banbury warehouse
Pictured: Banbury, Oxfordshire

Racking and barriers

Racking moved or reinstalled around the columns, with steel barriers on the aisles.

Empty steel-framed industrial unit with rooflights before the fit-out in Hackney
Pictured: the Fuse Energy unit in Hackney before our fit-out

Before any steel is ordered: slab, fire and building control

Most mezzanine problems start on day one, when a deck is bought from a catalogue before anyone has looked at the building. We begin with the floor. Every column sends its load into the slab, so we check its thickness and condition, then place the columns where the slab and the racking allow.

Next comes the fire strategy. A deck used for offices, packing or production normally needs a fire-rated ceiling and protected columns, and a deck bigger than half the floor below counts as a new storey, with longer escape routes to plan. Our engineer agrees this with building control and, where you have them, your insurer and sprinkler contractor.

Planning permission is rarely needed for a mezzanine inside a building, but a retail deck over 200 m² does, as can a planning condition, and many leases need the landlord's consent. We check both and prepare the drawings for each. The rules are explained in our guide to mezzanine floor regulations.

Racking and crates on pallets beside the new block in the Banbury warehouse, kept in use during the works
Pictured: the Banbury warehouse, kept running during our works

Installing while the warehouse keeps working

A deck goes up in zones. We fence the work area, bring the steel in outside your busiest hours and keep forklift routes and fire exits open throughout, so picking, dispatch and deliveries carry on.

Where racking sits in the way, our team takes it down, moves it and puts it back around the new columns, as we did when relocating the Drake's stock and racking into a railway arch in Bethnal Green. Steel barriers and bollards protect the columns and walkways from the first day the deck is used.

When the steel is finished, the electricians, fire protection and office trades follow straight on. You get one programme, one point of contact and a handover pack with the structural calculations, test certificates and completion certificate.

How it works

How a mezzanine project runs

01

Site survey

We measure the clear height, check the slab, the racking and the escape routes, and ask what the deck has to carry.

02

Design and fixed price

Layout, loads, stairs and fire protection drawn up, priced as one figure with a programme.

03

Approvals

Building control full plans, landlord consent and, for large shop decks, planning permission.

04

Installation

Steel, deck, stairs and guarding installed in zones, then fire protection, lighting and power.

05

Sign-off and handover

Load notices fixed, systems tested, completion certificate and drawings handed to you.

Cover of the free Craftex guide to warehouse refurbishment and fit-out

The Craftex Guide to Warehouse Refurbishment and Fit-Out

How a warehouse project is surveyed, approved, priced and delivered, including mezzanines, racking, power and the services an operation depends on.

In every mezzanine contract

Six commitments to warehouse occupiers

Written into the contract you sign.

  1. Designed for your building

    Columns placed after the slab and the racking are checked, never from a catalogue drawing.

    Fuse Energy came back to us for its mezzanine works.

  2. One fixed price

    Steel, stairs, fire protection and services in one figure; any extra is priced and approved first.

  3. Your operation keeps moving

    Zoned installation, open forklift routes and deliveries timed around your shifts.

    Banbury: the site kept running throughout.

  4. Approvals handled for you

    Building control, landlord consent and planning where a shop deck needs it.

  5. £10M cover

    Public, employers’ and professional liability; ISO 9001, 14001 and 45001.

  6. Certificates on handover day

    Structural calculations, load notices, test certificates and the completion certificate.

Example mezzanine floor quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Holding a mezzanine quote from a supplier or another contractor? Send it to us with the floor plan. We check what it leaves out, such as fire protection, the slab, lighting or approvals, and reply with our figure for the complete job.

Compare your quotes

Where mezzanine projects usually go wrong, and what we do instead

Six things to check in any proposal.

AreaThe usual riskWith Craftex
ResponsibilityThe supplier fits the steel; fire, lighting and approvals are left to youOne team from the slab survey to the completion certificate
Final billFire protection and a second stair added after building control reads the drawingsFire strategy agreed before the price is fixed
Your operationAisles closed and deliveries stopped for the installationZoned work around your shifts, forklift routes kept open
ProgrammeSteel arrives before approval, then waits on siteApproval first, then steel ordered to a fixed date
Floor slabColumns placed by a standard grid and a cracked slab laterSlab checked and column bases designed for it
HandoverNo load notice or certificate when the insurer asksCalculations, load notices and certificates on day one

What a mezzanine floor costs in 2026

Our 2026 rates per m² of deck, supplied and installed, ex VAT and fees. Use and fire rating set where your deck sits.

DeckWhat it coversRate
Storage deckSteel structure, deck boards, one stair, guarding and a pallet gate; no fire rating£84–£99/m²
Fire-rated deckAs above with a fire-rated ceiling, protected columns and a commercial stair£268–£315/m²
Fitted office deckFire-rated deck plus partitions, ceilings, lighting, heating and powerfrom £344/m²
Small decksUnder about 50 m², fixed costs weigh more per m²priced per deck
Projects we take onFrom one deck to a whole warehouse fit-out£100,000 to £10M+

Slab strengthening, sprinkler changes, racking and goods lifts are priced per building after a survey.

Send the floor plan and the clear height for a fixed figure; a detailed cost plan is available from £750 + VAT, credited if you build with us.

Free cost calculator

What will your mezzanine cost?

Enter the deck area and choose the type for an instant range at our 2026 rates.

Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT and fees, per m² of deck. A survey of the slab and the fire strategy sets your fixed figure.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Mezzanine floors: your questions

How much does a mezzanine floor cost?

At our 2026 rates a storage deck runs from about £84 to £99 per m², a fire-rated deck with a stair and guarding about £268 to £315 per m², and a fitted office on the deck from about £344 per m², ex VAT. The calculator above gives a range for your area; a survey fixes the figure.

Does a mezzanine need Building Regulations approval?

Yes, almost always. It is new structure, a new floor people walk on and a change to how the building is escaped in a fire. In a workplace we apply for full plans approval before installation, and we hand over the completion certificate.

Does the mezzanine need fire protection?

It depends on its size and use. Offices, packing and production decks normally do; a small storage deck often does not. If the deck covers more than half the floor below, it is treated as a storey. Our engineer sets this out with building control before any steel is ordered.

Can you install it while we keep working?

Yes. We fence off the work zone, schedule deliveries and lifting around your shifts and move racking in stages, so goods keep moving while the deck goes up.

Can a mezzanine be removed or moved when the lease ends?

Most steel mezzanines are bolted, so they can be taken down and reused. Check your lease first: many industrial leases need landlord consent for the deck and its removal at the end of the term.

Do I need planning permission for a mezzanine floor?

Usually not, because works that only affect the inside of a building are not development. The exceptions are a shop or trade counter adding more than 200 m² of sales floor, a planning condition that limits floor space, or changes to the outside. Our mezzanine floor regulations guide sets out each case.

Will my existing floor slab take the columns?

That is the first thing we check. Each column puts a point load on the slab, so we confirm its thickness and condition before the design is fixed, and use larger base plates or new pad foundations where the slab is thin.

How long does installation take?

The steel for a typical deck is usually erected in days. Survey, design, approval and steel lead time take longer, so allow several weeks from the first visit to handover, more when fire protection or a sprinkler change is involved.

Can you build offices on the mezzanine?

Yes. Partitions, ceilings, lighting, heating, power and data go on the deck in the same programme, so the storage below and the offices above are finished together.

Do you work outside London?

Yes, across the UK with the same team, including Kent, Surrey and Oxfordshire, where our team designed and built the Banbury warehouse.

What our clients say

See all reviews on Google
  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.

Need more floor space?

Send us the address, the floor plan and the clear height of the building. A director replies with what the space can take and the next step.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us