Skip to content
Request a callbackCallback
The Camden Lock railway bridge over Chalk Farm Road in Camden Town at night, a red bus passing underneath

Office Refurbishment and Fit Out in Camden

Offices refurbished and fitted out from Camden Town to King's Cross, Bloomsbury and Holborn.

Our track record

100% of projects delivered ahead
of programme and on budget

Portsoken House, Aldgate

  • 1,550 m²of office floors refurbished and fitted out across two storeys
  • 7 monthson site while every other tenant stayed at work in the building
  • 70 m²entrance hall and reception remade for tenants and visitors
  • 12 weeksfor that reception, all of it worked at night and at weekends

One team for Camden offices, old and new

We refurbish and fit out offices across the London Borough of Camden: studios in Camden Town, new floors at King's Cross, Georgian houses in Bloomsbury and professional offices around Holborn. Our designers, estimators and trades work as one team from the first survey to the handover file.

The borough mixes very different buildings. A listed terrace on a Bloomsbury square needs consent before a partition moves; a new floor near the canal comes with a landlord's rulebook. We plan for the building you have, and if you stay in during the works, we phase them so your team keeps working.

Tell us where the office is and the date it must be ready: our reply, and the plan that comes with it, will show you how we work.

Open-plan office with sit-stand desks at Beaumont House, Kensington, refurbished by our team

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Office work we take on in Camden

Whole floors, single rooms and everything in the ceiling. Related services: office fit-out in London, office design and space planning and urgent office alterations.

Open-plan office with white desks at Beaumont House, Kensington

Refurbishing the floor you occupy

New layout, finishes, lighting and furniture, phased so the business keeps running.

Open-plan desks on a floor we fitted out at Portsoken House, Aldgate

Fitting out a new floor

From a landlord's Cat A shell to a working office: rooms, kitchen, data and furniture.

Meeting table with white chairs at Beaumont House

Meeting rooms and boardrooms

Rooms that hold sound, with lighting and screens that work from the first meeting.

Finished reception with dark panelling and linear lights at Portsoken House

Receptions and entrance halls

The first space a client sees, rebuilt out of hours where the building stays open.

Office kitchen under pendant lights at Beaumont House

Kitchens and breakout areas

Tea points and staff kitchens with plumbing, extract and durable worktops.

New lighting, wiring and underfloor data during our works at Beaumont House

Lighting, power and data

Rewiring, floor boxes, LED lighting and data cabling, tested and certified.

A curved Georgian terrace beside a garden square in Bloomsbury

Camden Town, King's Cross, Bloomsbury and Holborn

The London Borough of Camden was formed in 1965 from Holborn, St Pancras and Hampstead. Its southern half shares the West End with Westminster and runs up to the City, so the borough covers some of London's busiest office districts. The council's offices are at 5 Pancras Square in King's Cross.

In Bloomsbury, much of the land around the garden squares belongs to the Bedford Estate, which has held it since the seventeenth century; many offices there are Georgian houses, often listed. King's Cross offers new floors with modern services and a landlord's fit-out guide. Camden Town and Kentish Town mix converted industrial buildings with offices above shops, and Holborn, on the southern edge, runs from period chambers to large modern office blocks.

Camden Council sets its own hours for noisy building work and its own guidance for conservation areas. We check both, and any estate's consent, before the programme is fixed.

How it works

How a Camden office refurbishment runs

01

Survey and brief

We measure the space, check the building's age, listing and services, and note how your team works.

02

Design and price

A layout and finishes, with a fixed price line by line before you commit.

03

Consents and licence

Landlord or estate licence, listed building consent and building control, where each is needed.

04

Phased works

Noisy tasks outside your working hours if you stay in, and every delivery booked.

05

Handover

Snags cleared, systems tested, and certificates and manuals delivered on the day.

Brick warehouse buildings at Coal Drops Yard, King's Cross, under a clear sky

Refurbishing an office in a listed house

Listed building consent is needed for any work that affects a listed building's character, and inside a Georgian house that can include moving a partition, boxing in a staircase or running new cables through panelling. We survey what is original, design around it and prepare the application alongside the landlord's licence, so neither holds up the other.

Most of the gains come from what is allowed without harm: better lighting, reversible joinery, quieter heating and cooling, rewiring along existing routes and furniture planned for tall, narrow rooms. Those are the changes that make an old house work as a modern office.

Cover of the free Craftex Guide to Office Fit-Out

The Craftex Guide to Office Fit-Out

For office managers and finance leads: refurbish or relocate, how licences and listed consent work, and how to keep the business running during the works.

In every Camden office contract

Our written commitments

Each one is a clause you can point to.

  1. Working back from your date

    Lease end, break or move-in sets the finish, and the programme is built backwards from it.

    Portsoken House: two floors in seven months, building occupied.

  2. Price agreed before work

    One fixed sum for the scope; any change is priced and signed off first.

    Every project to date finished on budget.

  3. Disruption kept low

    Phased areas, out-of-hours noisy work and clean shared spaces.

    Portsoken reception: nights and weekends only.

  4. Direct labour

    Around six in ten of the people on our sites work for Craftex itself.

  5. Cover that estates require

    £10M each of public liability, employers' liability and professional indemnity; ISO 9001, 14001 and 45001.

  6. Records you keep

    Certificates, O&M manuals and as-built drawings handed over with the keys.

Example office refurbishment quotation from another contractor with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Already holding a quote for your Camden office? Send it over. We test it against the building, the licence conditions and your date, then return a lower price for the identical specification, with a dated programme attached.

Compare your quotes

Where Camden office jobs slip, and how we keep them on track

Six points to compare between contractors.

AreaThe usual riskWith Craftex
Listed fabricPanelling or cornices damaged, enforcement letters followOriginal features recorded and protected; consent first
Estate or landlordWorks paused while the licence is renegotiatedLicence pack submitted with the design, not after it
Staying inStaff working beside open ceilings and dustPhased zones, sealed screens and noisy work after hours
New-build floorsSprinklers or the ceiling grid damaged and rechargedBase-build protected and checked against the fit-out guide
One responsible firmDesigner and builder blaming each otherDesign and build under one contract
The last dayMissing certificates and unfinished snagsEverything tested and documented before you move back in

Office refurbishment cost in Camden, 2026

Our 2026 rates per sq ft of office, before VAT and fees. Listed buildings and small floors sit towards the top of each range.

ElementScopeLow to high, per sq ft
Refurbishment and fit-out worksLayout, partitions, ceilings, finishes, kitchen and changes to lighting, power and cooling£63–108/sq ft (£678–1,165/m²)
FurnitureDesks, seating, meeting and breakout furniture£18–54/sq ft
Audio-visual and ITScreens and sound in meeting rooms, cabling and the comms cabinet£4.50–13.50/sq ft
Complete officeWorks, furniture and technology together£85.50–176/sq ft (£920–1,890/m²)

Listed building work, out-of-hours phases and estate conditions are priced per building. On staying in during works: refurbishing an office while you stay in.

After the survey you get a fixed price. A detailed cost plan costs £750 + VAT and is deducted from the contract sum if we carry out the works.

Free cost calculator

What will your Camden office refurbishment cost?

Put in the floor area or the number of staff and pick a finish level; the range uses our 2026 rates.

I know my
Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

A guide for budgeting, ex VAT and fees. Listed building work and night shifts are added once we have seen the office.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Office refurbishment in Camden: your questions

Which parts of Camden do you cover?

All of the borough: Camden Town, Kentish Town, King's Cross, Bloomsbury, Holborn, the Camden side of Fitzrovia and Covent Garden, and Hampstead. The council, Camden, is the same across all of them.

Do we need the estate's or landlord's consent?

Usually. Leases normally require a licence for alterations, and estates such as the Bedford Estate in Bloomsbury have their own approval process. We prepare the drawings and documents they ask for.

Do you fit out new floors at King's Cross?

Yes. New floors come with a landlord's fit-out guide; we design within it, protect the base build and submit our drawings and method statements for approval.

What does it cost?

At our 2026 rates the works run at about £63–108 per sq ft ex VAT, with furniture and screens on top. For a range sized to your office, use the calculator on this page.

Can you refurbish an office in a listed building?

Yes. We record the original features, design around them and apply for listed building consent where the works affect the building's character, before anything is removed.

Can we stay in the office during the works?

Yes. We split the work into phases, move noisy tasks outside your hours and keep the occupied areas clean and safe. Portsoken House stayed occupied throughout our works there.

How long does an office refurbishment take?

A single floor is often a matter of weeks; a listed house or a phased job takes longer. You get a dated programme after the survey.

How do we start?

Tell us where the office is, roughly how many square feet it covers and your target date. We visit, check the lease, the listing and the building's services, and come back with a design, a fixed price and a programme.

What our clients say

See all reviews on Google
  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.

Refurbishing an office in Camden?

Share the address, the size of the office and your deadline. After a look at the building, the lease and Camden's rules, we will say what is realistic by that date.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us