Office Refurbishment and Fit Out in Kensington
Offices refurbished around your lease date and your team, by one team from first call to handover.
Our track record
100% of projects delivered aheadof programme and on budget
Beaumont House, Kensington
- 750 m²office refurbished in Kensington: open plan, meeting rooms, kitchen
- 3 weekson site, so more than 150 staff moved in before the old lease ended
- 2 weeksfrom the client's first call to our team on site
- £10Mpublic liability, employers' liability and PI cover
Office refurbishment in Kensington's buildings
We handle office refurbishment in Kensington for offices of every size, from High Street Kensington to Olympia. At Beaumont House we refurbished 750 m² in three weeks so more than 150 staff could move before their lease ended, when other contractors wanted three months on site alone.
Kensington offices sit above the shops of Kensington High Street, in converted period buildings on quieter streets and in purpose-built blocks towards Olympia. Most jobs change the same things: the layout, partitions, ceilings and lighting, power, data and cooling, the kitchen and the meeting rooms.
Our team started that job within two weeks of the first call. If your own date is close, reach out and see for yourself how quickly we respond.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What we change in a Kensington office
Designed, approved and built by one team. Also under the same contract: commercial refurbishment of floors before they are let, and urgent office alterations for smaller jobs.
Desks for the whole team
Floors replanned so every person has a desk and the walkways stay clear. See our office fit-out in London.
Meeting and project rooms
Glazed rooms for calls and client meetings, with sound-reducing walls and good light.
Kitchens and tea points
A staff kitchen and tea points that cope with a full office at lunchtime.
Breakout and planting
Places to sit away from the desk, with planting that softens a busy floor.
Ceilings, lighting and cooling
New ceilings, LED lighting and cooling, planned with the layout rather than after it.
Joinery and finishes
Benches, storage and surfaces made to measure and finished to last in daily use.
Beaumont House: 750 m² in three weeks
A fast-growing UK tech company had five weeks left on its old lease and more than 150 staff to move. Other contractors wanted four weeks to price, four weeks to mobilise and three months on site.
Our team was on site within two weeks of the call. In three weeks we turned 750 m² into an open-plan office with meeting rooms, a kitchen and breakout space, for a budget of £350K, and the staff moved before the old lease ran out.
How it works
How an office refurbishment in Kensington runs
01
First call, then a visit
We take your lease date and headcount on the call and visit within days to measure and check the services.
02
Layout with its price
The layout is drawn and priced together, so you sign off one plan and one figure.
03
Licence for alterations
We prepare the drawings and method statements your landlord needs, and book building control.
04
Build to the lease date
The programme runs back from your date; noisy work stays in the council's hours unless it agrees more.
05
Move-in ready
Tested, certified and cleaned, so your team walks into a working office on day one.
Licences, conservation areas and working hours in Kensington
Kensington is in the Royal Borough of Kensington and Chelsea. Its rule for building work is simple: noise heard beyond the site only from 8am to 6pm, Monday to Friday, and none on Saturdays, Sundays or bank holidays.
Inside a leased office, the landlord's licence for alterations usually matters more than the council. Business centres and managed buildings often add their own rules for deliveries, lifts and working times, so we ask for them at the first visit.
Work inside an office rarely needs planning permission. If the building is listed or in a conservation area, signs, plant on the roof or a new shopfront may need consent; we check before anything is ordered.
The Craftex Guide to Office Fit-Out
A short free guide for whoever is running the move: what to agree with the landlord, how to set the budget and how to protect the move date.
In every Kensington office contract
Our promises
Terms we sign up to, written into the contract.
-
A date you can plan around
The programme is built back from your lease date before you sign.
Beaumont House: moved before the lease ended.
-
The price you agreed
One figure for one plan; changes priced in writing before any work.
100% of projects on budget.
-
Business as usual
Zoned works and quiet tasks in the evening when you stay in.
Portsoken House: 1,550 m² with the building in use.
-
Our own trades
Around 60% of the labour is ours, so the programme does not wait on other firms.
-
Fully covered
£10M public and employers' liability and professional indemnity; ISO 9001, 14001 and 45001.
-
Certificates at handover
Electrical, fire and building control paperwork ready for your landlord and insurer.
Already have a quote? Send it to us. We'll beat it.
Send us the proposal you have for your Kensington office. We compare it with the floor and your lease date and come back with a better figure for the same work, plus a programme.
Compare your quotes
Why Kensington office moves run late, and how we keep them on time
Check these six points in any proposal.
| Area | The usual risk | With Craftex |
|---|---|---|
| Time to start | A month to price and another to mobilise | On site within two weeks of the call when the date demands it |
| Time on site | Three months for a floor that could take weeks | Our own trades working in parallel: 750 m² in three weeks |
| Landlord | The licence application starts after the design is finished | Licence drawings prepared alongside the layout |
| Staff | Everyone works from home for the whole job | Zones and evening work so the office stays usable where possible |
| Design and build | Two firms, two contracts, two sets of excuses | One team draws, prices and builds |
| Day one | Snags, dust and missing certificates | Clean, tested and signed off before the first person arrives |
What an office refurbishment in Kensington costs
Our 2026 rates per sq ft for an office floor in Kensington, ex VAT and fees. Beaumont House, 750 m², had a budget of £350K.
| Item | What it covers | Low to high spec |
|---|---|---|
| Construction (Cat B) | Partitions, ceilings, flooring, kitchen and changes to the services | £63–108/sq ft (£678–1,165/m²) |
| Furniture | Desks, seating and meeting-room furniture | £18–54/sq ft |
| AV and IT | Meeting-room screens, conferencing and cabling | £4.50–13.50/sq ft |
| Total | All of the above | £85.50–176/sq ft (£920–1,890/m²) |
Assumes services in fair order; evening work and landlord conditions are priced per project. Full breakdown: office refurbishment cost.
Send the floor plan and lease date for a fixed figure; a detailed cost plan is available from £750 + VAT, credited if you build with us.
Free cost calculator
What will your Kensington office cost?
Enter the floor area or headcount and pick a specification for a range at our 2026 rates.
More office work by our team
The same directors lead every project
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Office refurbishment in Kensington: your questions
How fast can you refurbish an office in Kensington?
Faster than most firms expect. At Beaumont House we mobilised inside a fortnight and finished 750 m² in three weeks. After a visit we give you a programme for your own floor.
Do you work out of hours?
Yes, where it helps. Quiet jobs can run in the evening; Kensington and Chelsea allows noisy work only from 8am to 6pm on weekdays, so anything louder outside those hours needs the council's prior consent, which we apply for.
Can you design the layout too?
Yes. Our designers plan the floor with you. One client's Google review says our architect fitted more desks into their office, and our value engineering of another firm's MEP design saved them around £50K.
Do you do small offices?
Our projects usually start from £100,000. For smaller or urgent changes to a working office, see urgent office alterations.
Can you finish before our lease ends?
We plan backwards from the date your lease ends, with time for the landlord's licence, deliveries and testing. If the date cannot be met, we tell you at the first visit, not halfway through.
Do we need the landlord's licence?
Usually yes: most leases ask for a licence for alterations before partitions, ceilings or services change. We prepare the drawings and method statements; see licence for alterations explained.
What does it cost?
Cat B construction is about £63–108 per sq ft ex VAT before furniture and IT; use the calculator above for a range. For a firm number, book a detailed cost plan (from £750 + VAT, credited if we build it).
How do we start?
Send us the address, the floor area and the date you need to be in. We call back, visit and return with a layout, a price and a programme.
Before you refurbish
Office refurbishment checklist, office relocation fit-out checklist and office refurbishment while occupied. The full service: office fit-out in London. Homes in the area: builders in Kensington. Next door: office refurbishment in Chelsea. The project: Beaumont House.
What our clients say
See all reviews on Google-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.
Refurbishing an office in Kensington?
Send the address, floor area and your lease date, and we will tell you what can be done by then.



























