Shop Fit Out in Edinburgh
Shops, showrooms and concessions designed, approved and built for Edinburgh's listed streets and its newer malls.
Our track record
100% of projects delivered aheadof programme and on budget
Retail and salon work by our team, London
- 4 weeksof design for Drake's flagship on Savile Row, joinery included
- 8 weekson site at Drake's, with the shop open to customers throughout
- 180 m²over four levels at Medusa, Beauchamp Place, rebuilt turnkey
- £10Mcover for each of public, employers' and professional liability
Shopfitting for New Town terraces, Old Town closes and modern centres
Our shop fit out service in Edinburgh is for independent retailers, national brands and landlords letting a unit: fashion and footwear, beauty, homeware, food-to-go counters and showrooms. One team surveys the unit, draws the layout and the joinery, prepares the warrant and consent drawings and builds the shop.
Craftex works from London and takes retail projects anywhere in the UK; we have no branch in Scotland. A director walks the unit before any figure is given, most of the trades on site are employed by us, and a single contract covers design, approvals and the fit-out itself.
On Savile Row our team designed Drake's flagship refit in four weeks and built it in eight while customers kept buying. Send us your lease date and the address and judge the reply for yourself.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What we fit out for Edinburgh retailers
Joinery, services and finishes by one firm. More on the service nationally: retail fit out and shopfitting and retail interior design.
Fashion and footwear
Rails, shoe walls, fitting rooms and a cash desk at the front, with the stockroom planned behind them.
Beauty and wellness
Treatment rooms, nail and brow stations, plumbing and ventilation that cope with a full day of bookings.
Shopfronts and signs
Fascia, glazing, doors and lettering drawn to suit the street, then submitted for the consents they need.
Mall units and concessions
Units built to a centre's fit-out guide, tenant coordinator and permitted working hours.
Showrooms and galleries
Floors, walls and lighting arranged so the product is the first thing a visitor sees.
Lighting, power and security
Retail lighting, tills, data points, CCTV and intruder alarms, all tested before the stock arrives.
Princes Street, George Street, the Old Town and the malls
Edinburgh's shops sit in very different buildings. Princes Street, the southern edge of the New Town and the capital's main shopping street, has large stores on a road mostly limited to trams, buses and taxis, so skips, deliveries and scaffold are planned around those limits. George Street, Rose Street and Thistle Street hold smaller Georgian units, many with a basement and Multrees Walk off St Andrew Square carries designer labels.
In the Old Town, on Victoria Street, the Royal Mile and the Grassmarket, a shop is often a tenement ground floor with a narrow front, a steep pavement and stairs to a cellar. Westfield St James Quarter, opened in 2021 at the east end of the New Town, and the out-of-town centres at the Gyle and Fort Kinnaird have their own fit-out guides, tenant coordinators and hours for noisy work.
Each of these changes how a programme is written: when materials can arrive, where waste leaves, what can be done during trading hours. We settle that with you and the landlord before we price.
Building warrant, Class 1A and consent for the shopfront
Most shop fit-outs in Edinburgh need a building warrant from the council's building standards service before work starts. The Building (Scotland) Act 2003 requires one for building work and for new services, fittings or equipment, and when the job is finished a completion certificate goes to the council for acceptance. New partitions, fire alarms, emergency lighting, accessible WCs and a changed escape route all come within it.
Planning turns on the use and the outside of the building. Since 31 March 2023 shops and most high-street services share Class 1A of the Scottish Use Classes Order, so a clothes shop becoming a travel agent or an estate agent normally needs no change of use, while hot food takeaways fall outside the class. A new or altered shopfront often needs planning permission, and an illuminated sign usually needs advertisement consent; on a listed building, listed building consent as well, which can extend to the interior.
Much of the centre is inside the Old and New Towns of Edinburgh World Heritage Site, inscribed in 1995, and applications are weighed against City Plan 2030, adopted on 7 November 2024, together with National Planning Framework 4. We prepare the warrant, planning, advertisement and listed building drawings as one package, timed to the date your lease starts.
How it works
Your Edinburgh shop, from survey to opening day
01
Unit and lease first
We walk the unit, read the lease and the landlord's or centre's fit-out rules, and note power, drainage and access.
02
Layout and joinery drawn
Floor plan, display walls, counters and lighting designed around your brand, priced line by line.
03
Warrant and consents
Warrant drawings to the council, shopfront and sign applications, and the landlord's approval, all in one timetable.
04
Workshop and site together
Joinery is made off site while the unit is stripped and rewired, so the two finish together.
05
Keys, certificates, stock in
Completion certificate submitted, systems tested, snags closed and the shop clean for your merchandisers.
A refit while the tills keep ringing
Many retailers cannot close for a refit. At Drake's flagship, 9 Savile Row in Mayfair, our team replaced the lighting with commercial-grade retail fittings, laid flooring built for heavy footfall, made and installed the bespoke joinery and a five-metre clothing rail system, and ran new power and data to the shop floor and the staff desks. The shop stayed open to customers throughout.
For an Edinburgh shop the same method applies: the floor is split into zones, dusty work happens out of hours, display walls are made in the workshop while the old ones are still trading, and each zone is handed back clean before the next one closes.
The Craftex Guide to Retail Fit Out
What drives the budget of a shop, how long each stage takes and the questions worth asking any shopfitter before you sign.
In every Edinburgh retail contract
Six things you get in writing
Contract terms, not sales talk.
-
A shop open on the agreed day
The programme starts from your opening date and works backwards.
Drake's: designed in four weeks, built in eight.
-
The figure you approved
Any change is costed and signed by you before anyone builds it.
-
Joinery drawn and made for you
Display walls, counters and rails detailed by our designers, not picked from a catalogue.
-
Trades we employ
About 60% of the labour on our sites works directly for Craftex.
-
Cover landlords accept
£10M each of public, employers' and professional liability; ISO 9001, 14001 and 45001.
-
Papers ready for opening
Completion certificate submitted, test certificates and manuals in the file when you get the keys.
Medusa: certificates, drawings and manuals handed over.
Already have a quote? Send it to us. We'll beat it.
Holding a shopfitter's price for an Edinburgh unit? Send it with the drawings. We check what it leaves out against the lease and the council's requirements, then give you our own figure for the same shop with a dated programme.
Compare your quotes
Where Edinburgh shop openings go wrong, and our answer
Six questions to ask every shopfitter you meet.
| Area | The usual risk | With Craftex |
|---|---|---|
| Warrant | Work started before the warrant was granted, then stopped by the council | Warrant drawings lodged first, start date set once it is granted |
| Shopfront and sign | A fascia fitted and then refused in a conservation street | Designed to the street and approved before it is ordered |
| The centre's rules | Fit-out guide ignored, so the tenant coordinator halts the work | Guide read at the first visit and written into the method |
| Joinery | Display units late from a third-party maker | Our own drawings, made in parallel with the strip-out |
| Neighbours and access | Deliveries blocked on Princes Street or a steep Old Town close | Loading slots and routes agreed before day one |
| Handover | No completion certificate when the shop wants to open | Certificate submitted with tests and manuals ready |
What a shop fit-out costs in Edinburgh, 2026
Our 2026 rates, before VAT and fees. Scottish jobs are priced at our national rates with no London uplift.
| Finish level | Typical scope | Per sq ft (per m²) |
|---|---|---|
| Store refresh | Decoration, new lighting, flooring repairs, refreshed fixtures | £49.50 (£532/m²) |
| Full shop fit-out | Partitions, ceilings, lighting, power, new joinery and floor | £87.50 (£944/m²) |
| Flagship with bespoke joinery | Specialist finishes, feature lighting, bespoke display throughout | £146 (£1,570/m²) |
| Worked example | A 150 m² unit, full fit-out | about £120,000 to £142,000 in total |
A new shopfront, out-of-hours work, basement stairs and work to listed fabric are priced for each unit. Background: shop fit-out cost per m², from refresh to flagship.
After the survey you receive a fixed sum and a programme; a detailed cost plan is available from £750 + VAT and is credited if we build the shop.
Free cost calculator
Estimate your Edinburgh shop
Type the sales floor area and pick a finish; the range uses our 2026 retail rates.
Retail work our team has delivered
-
Savile Row, Mayfair, London Drake's flagship: four weeks of design, eight on site, open throughout View case study
-
Beauchamp Place, Knightsbridge, London Medusa: a four-level salon and spa, concept to handover in 17 weeks View case study
-
Bethnal Green, London Drake's again: the same retailer's studio, offices and dispatch in a railway arch View case study
The same directors lead every project
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Shop fit-out in Edinburgh: your questions
Do you have an office in Edinburgh?
No. We are based in London and build across the UK. A director surveys your unit before pricing and stays your contact until the shop opens.
Do I need planning permission to change the use of a shop?
Not between uses inside Class 1A, which since March 2023 covers shops and most services to visiting customers. A café with hot food to take away, a restaurant or a bar is a different matter and normally needs consent.
What about the sign?
Illuminated and projecting signs usually need advertisement consent. We draw the sign with the shopfront so both applications go in together.
Can you fit out a unit in Westfield St James Quarter or a retail park?
Yes. We work to the centre's fit-out guide, submit the drawings and method statements the tenant coordinator asks for and keep to its working hours.
Does a shop fit-out need a building warrant?
Usually. New partitions, lighting circuits, fire alarms, accessible WCs or changes to the way out all need a warrant before work begins, and the council must accept a completion certificate at the end. We draw and submit both.
Can I change the shopfront of a listed building?
Often, with planning permission and listed building consent, and with care in the World Heritage Site. We survey what is original, design around it and prepare the applications.
How long does a shop fit-out take?
It depends on the size and the approvals. Drake's flagship took four weeks of design and eight on site; Medusa, over four levels, took 17 weeks from first concept to handover.
What do I send to start?
The address, the floor plan or agent's particulars, photos and the date you want to trade. We visit, read the lease and return with a layout, a figure and a programme.
Before you take the unit
Guides: retail design: store layouts, shopfronts and lighting, how to choose a shopfitter and how a retail fit-out runs, step by step. Also in the capital: restaurants, pubs and bars, offices and everything we build in Edinburgh. In the west: shop fitters in Glasgow.
What our clients say
See all reviews on Google-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.
Opening a shop in Edinburgh?
Send the address, the size of the unit and the day you want to trade. A director replies with what the building needs and a first programme.



























