Skip to content
Request a callbackCallback
Curved Georgian crescent of stone townhouses with bay windows and chimneys in Edinburgh

Commercial Refurbishment in Edinburgh

Offices, shops and whole buildings stripped back, re-serviced and made ready to let or to occupy.

Our track record

100% of projects delivered ahead
of programme and on budget

Refurbishments by our team, London

  • 1,550 m²over two floors at Portsoken House, rebuilt with a floor still let
  • 7 monthsfor Portsoken from the first strip-out to tenants moving in
  • 12 weeksof nights and weekends to rebuild its reception, every tenant at work
  • 3 weekson site for a 750 m² office refurbishment at Beaumont House

Refurbishment for landlords, owners and the firms inside

Our commercial refurbishment work in Edinburgh is for landlords bringing space back to the market, owners upgrading a building they occupy and tenants reworking a floor without moving out. We strip out, renew tired services, repair and refinish, and take care of the building warrant and any consents, under one contract.

We are a London company and we refurbish buildings across the UK, without a Scottish branch. A director inspects the building before we price, most of our site labour is employed by us, and the design, the approvals and the works stay with one firm.

In Aldgate our team rebuilt two office floors, 1,550 m² with new services throughout, while another floor of the same building stayed let and working. Tell us what the building needs to be ready for, and by when.

Glass-fronted private offices on a floor our team fitted out at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London, fitted out by our team

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Six kinds of refurbishment we carry out in Edinburgh

From one floor to a whole building. The national service: commercial fit-out and refurbishment; lease-end work: strip-out contractors.

Open office floor stripped back and ready for fit-out at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Soft strip to shell

Ceilings, partitions, raised floors and redundant cabling removed, with waste sorted and recorded.

Empty office floor with new ceiling services and windows at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Floors ready to let

Vacant space brought to a clean Cat A standard so an agent can show it and a tenant can plan it.

Rebuilt reception with dark stone at Portsoken House, Aldgate, London
Pictured: Portsoken House reception, London

Receptions and common parts

Entrances, lift lobbies and stairs rebuilt out of hours, so the people upstairs keep working.

Office floor with new exposed ductwork, lighting and power at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Heating, cooling and power

Old plant, boards and lighting replaced and tested, with the energy figures recorded for the file.

Drake's on Savile Row, Mayfair, London, after the interior refit by our team
Pictured: Drake's, Savile Row, London

Shops and ground floors

Shop units and their frontages repaired and refitted, with the flats or offices above left undisturbed.

Showers and lockers under exposed ductwork at Portsoken House, Aldgate, London
Pictured: Portsoken House, Aldgate, London

Showers, WCs and cycle stores

End-of-trip rooms, accessible WCs and bike storage that tenants now expect in a city office.

Victorian stone buildings and a church spire against a blue sky in central Edinburgh

Georgian terraces, Victorian banking halls and post-war blocks

Edinburgh's commercial buildings cover three centuries, and each age brings its own refurbishment problems. In the New Town, townhouses on Charlotte Square, Queen Street and Melville Street became offices long ago: stone walls, timber sash windows, lath-and-plaster ceilings and stairs that limit how cabling and ducts can run. Grand Victorian banking halls on George Street and St Andrew Square now house shops, bars and restaurants, with high ceilings and decorative plaster worth keeping.

Blocks from the 1960s to the 1980s, in the city centre and around Haymarket, tend to need new plant, lighting and glazing, and they often contain asbestos that has to be surveyed and removed before any strip-out. The business parks at South Gyle and Edinburgh Park have newer frames, though some of their heating, cooling and controls are now due for replacement.

We survey the fabric, the services and the paperwork first, so the scope and the price reflect the building you actually own.

Lift lobby and stair rebuilt by our team at Portsoken House, Aldgate, London
Pictured: the lift lobby and stair at Portsoken House, London

Warrant, listed building consent and the Section 63 action plan

Refurbishment in Scotland runs on a building warrant. Under the Building (Scotland) Act 2003 a warrant is needed for most building work and for new services, fittings or equipment, and the council's building standards team must accept a completion certificate when the work ends. In a listed building the listing covers the interior as well as the façade, so stripping out panelling, plaster or a stair can need listed building consent; Historic Environment Scotland is consulted on some cases.

Energy is the other rule owners meet when they sell or let. For a non-domestic building or unit of more than 1,000 m², the Assessment of Energy Performance of Non-domestic Buildings (Scotland) Regulations 2016 require an action plan from a section 63 adviser to be available to buyers and tenants. The owner then either carries out the improvements within 42 months or records the building's actual energy use and reports it through a display energy certificate.

Before soft strip begins, any asbestos has to be found and managed under the Control of Asbestos Regulations 2012, which apply across Great Britain. We build all three into one programme: survey, consents and warrant, then the works and the completion certificate.

How it works

How an Edinburgh refurbishment runs

01

Building survey

Fabric, services, asbestos records, title and lease obligations checked before we put a figure on paper.

02

Scope and fixed price

A schedule of works priced line by line, with options to stage the spend.

03

Warrant and consents

Warrant drawings, listed building consent where needed, and the landlord's or factor's approval.

04

Works in phases

Strip-out, services and finishes floor by floor, planned around anyone still using the building.

05

Completion and records

Completion certificate to the council, test certificates, manuals and the energy data in one file.

Visitors at the rebuilt reception desk of Portsoken House, Aldgate, London
Pictured: the reception our team rebuilt at Portsoken House, London

Refurbishing a building that people still use

Most commercial refurbishments happen with someone in the building. At Portsoken House in Aldgate our team fitted out two floors from scratch over seven months while another floor was let and occupied. Deliveries were timed so materials arrived and left quickly, and the reception was rebuilt in the evenings and at weekends over 12 weeks, so the tenants upstairs never lost their entrance.

In Kensington, at Beaumont House, we were on site two weeks after the first call and finished a 750 m² office refurbishment in three weeks, where other contractors had asked for at least twelve. The same planning applies in Edinburgh: noisy work out of hours, a clean route for occupiers and a programme the building manager signs off.

Cover of the free Craftex Guide to Commercial Fit Out

The Craftex Guide to Commercial Fit Out

The stages of a commercial refurbishment, the terms surveyors use and what moves the cost and the programme, in one short read.

In every Edinburgh refurbishment contract

What we put our name to

Each one is a term you can hold us to.

  1. A survey before a figure

    Nobody prices your building from photos; a director walks it first.

  2. One price for the agreed scope

    Additions are costed and signed by you before the work is done.

    100% of our projects on budget.

  3. Occupiers kept working

    Noisy and dusty tasks scheduled around the people who stay in the building.

    Portsoken: a let floor working throughout.

  4. Our own site teams

    About 60% of the labour on our sites is employed by Craftex.

  5. Insurance owners ask for

    £10M public liability, £10M employers' liability and £10M professional indemnity, with ISO 9001, 14001 and 45001.

  6. A file you can sell or let with

    Completion certificate, test certificates, manuals and drawings handed over together.

Example refurbishment quotation from another contractor with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Already priced by another contractor? Send us the quote and the schedule of works. We check what is excluded or left provisional, then give you our own figure for the same scope and a programme you can plan a letting around.

Compare your quotes

Why commercial refurbishments overrun, and how we stop it

Six points to raise before you appoint anyone.

AreaThe usual riskWith Craftex
Hidden conditionCeilings opened to reveal asbestos or rot after the price was fixedIntrusive survey and asbestos check before the figure
Listed interiorsPlaster or panelling removed, then a consent problemListing checked and consent drawn before strip-out
WarrantServices replaced with no warrant in placeWarrant lodged first, completion certificate planned from day one
OccupiersComplaints from tenants who still work in the buildingOut-of-hours slots and clean routes agreed in writing
EnergyA building marketed without the action plan buyers must seeSection 63 position checked and improvements priced in
RecordsCertificates chased for months after handoverOne complete file on the last day

Commercial refurbishment rates in Edinburgh, 2026

Our 2026 rates per square metre before VAT and fees, at national rates with no London uplift.

ScopePer m²
Soft strip back to shellfrom £94
Essential refurbishment: decoration, lighting, floor finishes£452–532
Standard refurbishment: partitions, ceilings, power, WCs£802–944
Major refurbishment with new services£1,010–1,190, plus about £157 for air conditioning throughout

Asbestos removal, stone and window repair and work to listed interiors are priced once the building has been surveyed. More: how a commercial refurbishment works, stage by stage.

A fixed sum and a programme follow the survey; a detailed cost plan costs from £750 + VAT and is credited if we carry out the works.

Free cost calculator

Estimate your Edinburgh refurbishment

Enter the floor area and choose a level of work; the range uses our 2026 rates.

Add
Your estimateEnter your spaceex VAT and fees Ask for a fixed figure

A guide only, before VAT and fees. Asbestos, listed fabric and plant replacement are added after the survey.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Commercial refurbishment in Edinburgh: your questions

Are you an Edinburgh firm?

No. Craftex is based in London and refurbishes buildings throughout the UK. A director surveys your building before quoting and stays involved until handover.

Can you strip out a listed building?

Yes, with care. In Scotland the listing covers the interior, so we record what is historic, agree with the council what can go and obtain listed building consent before anything is removed.

Can tenants stay in the building during the works?

Usually. We phase the work, keep noisy tasks out of hours and agree access with the building manager. At Portsoken House another floor stayed let and working throughout.

How long does a commercial refurbishment take?

A single floor can take weeks; Beaumont House, 750 m², took three. Two floors with new services throughout took seven months at Portsoken House. We fix the programme before you sign.

Does a refurbishment need a building warrant?

Most do. Replacing services, moving walls, altering fire doors, alarms or escape routes all need one, and the council must accept a completion certificate afterwards. Like-for-like decoration usually does not. We confirm which applies.

What is a Section 63 action plan?

When a non-domestic building or unit larger than 1,000 m² is sold or let, buyers and tenants must be able to see its energy action plan. It sets energy improvements, which can be carried out within 42 months or deferred by recording actual energy use.

What about asbestos?

Buildings older than 2000 can contain it. We arrange a refurbishment survey before strip-out and use licensed removal where the survey calls for it.

How do we start?

Send the address, floor plans and what the building must be ready for: a letting, a sale or your own move. We visit and return with a scope, a figure and a timetable.

What our clients say

See all reviews on Google
  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.

Refurbishing a building in Edinburgh?

Send the address, the floor area and the date it must be ready. A director replies with what the building needs and a first programme.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us